The 2000MW coal-based Simhadri Station is the first power project to implement an open sea intake from the Bay of Bengal which has been functional for more than 20 years. NTPC is also planning to set up a hydrogen-based micro-grid system on a pilot basis at Simhadri.
With a total installed capacity of 66900 MW, NTPC Group has 71 Power stations including 29 Renewable projects. NTPC has set a target to install 60 gigawatts (GW) of renewable energy (RE) capacity by 2032. NTPC is also India's first energy company to declare its energy compact goals as part of the UN High-level Dialogue on Energy (HLDE).
Dec 06, 2024
TUI Staff
Dec 02, 2024
TUI Staff
Stay Tuned with The United Indian!
Our news blog is dedicated to sharing valuable and pertinent content for Indian citizens. Our blog news covering a wide range of categories including technology, environment, government & economy ensures that you stay informed about the topics that matter most. Follow The United Indian to never miss out on the latest trending news in India.
©The United Indian 2024